Demolition of the main entrance door to the building, windows and blinds of the facade and interiors of the entire building. Transportation to recycling point and payment of recycling fees.
In total, 1 main entrance door, 17 windows and doors. And 11 motorized blinds.
The installation of windows, doors and windows and the main entrance door has been made with steel fastening pegs, stainless steel screws and afterwards we have used polyurethane foam insulation. Finaly we have covered with damp concrete - cement for finishing the outside walls. Béton hydrofugé.
Installation of windows, doors - windows and main entrance door to the building.
1 window and 2 French doors on the ground floor.
1 main entrance door to the building. Door with decorative moldings at the bottom.
2 windows on the access staircase to the first and second floor of the building. Tilt-and-turn wigwag system, hinges, ironworks and fittings Roto Frank of the highest quality.
2 windows in the two rooms on the first floor plus 2 others in hallway and bathroom plus 2 doors - windows
2 windows in the two bedrooms of the second floor plus 2 hallway and bathroom plus 2 doors - windows.
All the windows we have installed are PVC made of the leading brand CORTIZO THERMOTEC with 5 insulating chambers, galvanized steel reinforcements, double - glazing with butiral and argón, aluminium shutter and monoblock shutter drawer.
As we have said, we have changed all the Windows of this buildiing. PVC Windows CORTIZO TEHRMOTEC with galvanized steel reinforcements and doublé-glazed. Tilt-and-turn wigwag system, hinges, ironworks and fittings Roto Frank of the highest quality that guarantee its perfect functioning for decades with a very confortable degree of confort.
To reduce the heat input from the outside we have installed glass with low emissive treatment (glass treated with silver oxide) that reduce up to 80% the amount of heat (infrared rays) that enters the house. This treatment blocks infrared radiation, that carries energy from sunlight, without limiting the amount or tonality of light entering.
In addition we used doublé - glazed windows with ARGON gas, instead of air in the sealed chamber among the glazing, in order to obtain a noticeable lowering of the coefficient μ. The explanation is simple physics: the transmission of cold - heat from one glas sheet to another is produced by the internal currents that exist in the sealed air chamber among the glazings. Argon is a heavier gas than air and, therefore, taking longer to heat up or cool down, currents and termal transmittance will be lower. The result is that we get a coefficient μ significantly lower.
We've painted the lintels and the sills, window ledge - windowsills of the whole building.
Previously we have polished the walls to make them look smooth and homogeneous. We cover cracks, sanding it all afterwards. We apply a primer and three layers of paint.
Thus we reach the end point of the work, thoroughly clean the whole building before its delivery to the customer.
Finally we deliver the apartment to the client completely clean. Ready for start living.